email mobile

Posted: Monday, 16 December 2013 2:10PM

Due To Water Damage A New Floor Is Being Installed In Gym Of Mattawan HS



There's a change of plans for the Mattawan High School gymnasium. After a November windstorm, work to replace the roof is now being joined by installation of a new floor.

Listen:

   
Superintendent Dr. Patrick Bird says the buckling was potentially dangerous to students using the gym. The roof is currently sealed off, and will be replaced in the spring.

Listen:

   
Bird thanks other school districts for offering-up their facilities while Mattawan's is out of commission. Until the floor is installed, school events will be held at the Mattawan Elementary School, which uses the old high school gym.


WebReadyTM Powered by WireReady® NSI


A   A   A
 Follow